== Current Project Schedule ==
== Current Project Schedule ==


Write a linker script and custom ELF loader to provide full support for loadable modules in ScummVM’s PS2 Port, using the pre-existing PSP code as a starting point.
====Write a linker script and custom ELF loader to provide full support for loadable modules in ScummVM’s PS2 Port, using the pre-existing PSP code as a starting point.====


Completed on June 13th!
Completed on June 13th!
    
    


Implement support for loadable modules on the GP2x, an ARM target. (To be completed by: July 9th)
====Implement support for loadable modules on the GP2x, an ARM target. (To be completed by: July 9th)====
  First Week Goal: Get debugging facilities set up for the GP2x. Get initial linker scripts/loader coded. (Continue testing/documenting PS2 work).
  Second Week Goal: Tweak Makefile and begin debugging.
  Third Week Goal: Continue work on the GP2x Wiz.
  Fourth Week Goal: Finish ELF loader for the Wiz.


June 14th-18th: Get debugging facilities set up for the GP2x. Start coding initial linker scripts/loader. (Continue testing/documenting PS2 work).


Abstract parent “ELF Loader” class to be inherited by targets that support loadable modules. (To be completed by: July 16th)
June 21st-25th: Tweak Makefile and finish initial linker/loader code. Begin debugging.


June 28th - July 2nd: Continue work on the GP2x Wiz.


Implement support for loadable modules on the DS with the aid of the ARM-based GP2x code. (To be completed by: August 13th)
July 5th - July 9th: Finish ELF loader for the Wiz.
  First Week Goal: Get Debugging Facilities Set up for the DS and make design decisions with mentors (for instance, only one engine can be loaded at a time instead of all loaded then unneeded ones deleted).
  Second Week Goal: Begin making necessary changes to GP2x loader/linker to adapt it for DS and altered design.
  Third Week Goal: Continue work on the DS.
  Fourth Week Goal: Finish coding!


Continue work with ScummVM? ;-)
 
====Abstract parent “ELF Loader” class to be inherited by targets that support loadable modules. (To be completed by: July 16th)====
 
July 12th-16th: Do the task!
 
 
====Implement support for loadable modules on the DS with the aid of the ARM-based GP2x code. (To be completed by: August 13th)====
 
July 19th-23rd: Get Debugging Facilities Set up for the DS and make design decisions with mentors (for instance, only one engine can be loaded at a time instead of all loaded then unneeded ones deleted).
 
July 26th-30th: Begin making necessary changes to GP2x loader/linker to adapt it for DS and altered design.
 
August 2nd-6th: Continue work on the DS.
 
August 9th-13th: Finish coding!
 
 
====Continue work with ScummVM? ;-)====