Line 18: | Line 18: | ||
*<strike>June 8: First disassembler (SCUMMv6)</strike> Completed June 4 | *<strike>June 8: First disassembler (SCUMMv6)</strike> Completed June 4 | ||
*<strike>June 21: Generation of code flow graph</strike> Completed June 14 | *<strike>June 21: Generation of code flow graph</strike> Completed June 14 | ||
*July 5: Code flow analysis | *<strike>July 5: Code flow analysis</strike> Completed July 5 | ||
*July 24: Code generation (SCUMMv6) | *July 24: Code generation (SCUMMv6) | ||
*July 29: Second disassembler (KYRA) | *July 29: Second disassembler (KYRA) |