Difference between revisions of "SAGA/TODO"

Jump to navigation Jump to search
74 bytes added ,  18:41, 8 July 2005
(Puzzle graphics glitch is fixed now)
Line 20: Line 20:


** Ending sequence has zillions of GFX bugs
** Ending sequence has zillions of GFX bugs
*** Actors are drawn at Chota's falling. They shouldn't
*** Actors are drawn (some pixels above status bar) at Chota's falling. T
*** Inventory is visible when Chota's talking and his portrait is drawn on top of it
*** Celebration scene has inventory when it should be full screen


* Interface
* Interface
Line 33: Line 31:
* DONE - review&remove it
* DONE - review&remove it
** Rif walks backwards at first enounter with Elara and in hardware store at Ferret Village.
** Rif walks backwards at first enounter with Elara and in hardware store at Ferret Village.
*** Actors are drawn at Chota's falling. They shouldn't
*** Inventory is visible when Chota's talking and his portrait is drawn on top of it
*** Celebration scene has inventory when it should be full screen


== Long-term ToDos ==
== Long-term ToDos ==
17

edits

Navigation menu