Difference between revisions of "User:Buddha^/GSoC2007-ProjectDiary"

Jump to navigation Jump to search
m
Changed wording on 2007-06-07's summary.
(Added summaries for each day so it'll be easier to see at a glance what I was doing each day.)
m (Changed wording on 2007-06-07's summary.)
Line 78: Line 78:
(Knocks wood).
(Knocks wood).


== 2007-06-07 (Thursday) - Implemented fallback detection for the AGI engine ==
== 2007-06-07 (Thursday) - Finished fallback detection for the AGI engine ==


After some talk with a friend of mine and much talk with my mentor Sev about the
After some talk with a friend of mine and much talk with my mentor Sev about the
417

edits

Navigation menu