====Write a linker script and custom ELF loader to provide full support for loadable modules in ScummVM’s PS2 Port, using the pre-existing PSP code as a starting point.====
====Write a linker script and custom ELF loader to provide full support for loadable modules in ScummVM’s PS2 Port, using the pre-existing PSP code as a starting point.====


Completed on June 13th!
<strike>May 24th - June 13th: Do the task!</strike>
    
    


Line 34: Line 34:
====Implement support for loadable modules on the DS. (To be completed by: July 16th)====
====Implement support for loadable modules on the DS. (To be completed by: July 16th)====


July 5th-9th: Get Debugging Facilities Set up for the DS, completely code module loader for DS.
<strike>July 5th-9th: Get Debugging Facilities Set up for the DS, completely code module loader for DS.</strike>


July 12th-16th: Debug and test DS (only building one or two plugins) until the module loader is in a usable state.
<strike>July 12th-21st: Debug and test DS (only building one or two plugins) until the module loader is in a usable state.</strike>




====Change Plugin Design (To be completed by: July 30th)====
====Abstract parent “ELF Loader” class to be inherited by targets that support loadable modules. (To be completed by: August 6th)====


July 19th-23rd: Begin Plugin Design Change Work. Complete "First Refinement" and Begin on "Long Term Approach" (see "Plugin Design Change Plans" below).
<strike>July 22nd-25th: Do the task!</strike>


July 26th-30th: Complete "Long Term Approach" (see "Plugin Design Change Plans" below).


====Change Plugin Design (To be completed by: July 30th)====


====Abstract parent “ELF Loader” class to be inherited by targets that support loadable modules. (To be completed by: August 6th)====
July 26th-30th: Begin Plugin Design Change Work. Complete "First Refinement" and Begin on "Long Term Approach" (see "Plugin Design Change Plans" below).


August 2nd-6th: Do the task!
August 2nd-6th: Complete "Long Term Approach" (see "Plugin Design Change Plans" below).




====End of Summmer====
====End of Summmer====


August 9th-13th: Wiggle Room for finishing GSOC :-)
August 9th-13th: Code Reintegration Phase/Wiggle Room :-)


August 14th-???: Continue work with ScummVM? ;-)
August 14th-???: Continue work with ScummVM? ;-)