Difference between revisions of "User:Toneman"

Jump to navigation Jump to search
35 bytes added ,  18:24, 7 August 2010
m
no edit summary
m
m
 
(2 intermediate revisions by the same user not shown)
Line 36: Line 36:
<strike>July 5th-9th: Get Debugging Facilities Set up for the DS, completely code module loader for DS.</strike>
<strike>July 5th-9th: Get Debugging Facilities Set up for the DS, completely code module loader for DS.</strike>


July 12th-21st: Debug and test DS (only building one or two plugins) until the module loader is in a usable state.
<strike>July 12th-21st: Debug and test DS (only building one or two plugins) until the module loader is in a usable state.</strike>




====Abstract parent “ELF Loader” class to be inherited by targets that support loadable modules. (To be completed by: August 6th)====
====Abstract parent “ELF Loader” class to be inherited by targets that support loadable modules. (To be completed by: August 6th)====


July 22nd-25th: Do the task!
<strike>July 22nd-25th: Do the task!</strike>




Line 49: Line 49:


August 2nd-6th: Complete "Long Term Approach" (see "Plugin Design Change Plans" below).
August 2nd-6th: Complete "Long Term Approach" (see "Plugin Design Change Plans" below).


====End of Summmer====
====End of Summmer====
27

edits

Navigation menu