Difference between revisions of "OpenTasks"

Jump to navigation Jump to search
142 bytes removed ,  18:40, 29 May 2016
Remove custom table properties
(Remove custom table properties)
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
'''See [[GSoC Ideas]] if you're looking for Google Summer of Code ideas for 2013.'''
'''See [[GSoC Ideas]] if you're looking for Google Summer of Code ideas for 2014.'''
 
'''See [[ClosedTasks|Closed Tasks]] for a list of tasks proposed the previous years'''




Line 65: Line 67:
These tasks can be considered in addition or in conjunction with anything on our [[TODO]], any other task or your own 'Anything you can dream of' project.
These tasks can be considered in addition or in conjunction with anything on our [[TODO]], any other task or your own 'Anything you can dream of' project.


They are usually NOT kept up to date. Please contact us (ideally via IRC) before you even start thinking about one of these tasks. Again, see [[GSoC Ideas]] if you're looking for Google Summer of Code ideas for 2012.
They are usually NOT kept up to date. Please contact us (ideally via IRC) before you even start thinking about one of these tasks. Again, see [[GSoC Ideas]] if you're looking for Google Summer of Code ideas for 2014.


<!--The GSoC workload figure was used to indicate the percentage of GSoC project time we consider this task will take an average competent programmer. These are just rough guides and should you feel you can undertake a task well in less time (or take longer but deliver a much better or more feature rich result) please feel free to mention this on your application and select your tasks accordingly.-->
<!--The GSoC workload figure was used to indicate the percentage of GSoC project time we consider this task will take an average competent programmer. These are just rough guides and should you feel you can undertake a task well in less time (or take longer but deliver a much better or more feature rich result) please feel free to mention this on your application and select your tasks accordingly.-->
Line 73: Line 75:
category = Open Tasks
category = Open Tasks
include = {Infobox_OpenTasks} Inforow
include = {Infobox_OpenTasks} Inforow
table = border="1" cellpadding="2" class="sortable" ,-, style="background:silver" | Task, style="background:silver" | (Outdated) Workload, style="background:silver" | Technical Contact(s), style="background:silver" | Subsystem
table = class="wikitable sortable" ,-, Task, (Outdated) Workload, Technical Contact(s), Subsystem
</dpl>
</dpl>


Line 86: Line 88:
category = TODO List
category = TODO List
include = {Infobox_TODO} Inforow
include = {Infobox_TODO} Inforow
table = border="1" cellpadding="2" class="sortable" ,-, style="background:silver" | Task, style="background:silver" | Technical Contact(s), style="background:silver" | Subsystem
table = class="wikitable sortable" ,-, Task, Technical Contact(s), Subsystem
</dpl>
</dpl>
TrustedUser
2,147

edits

Navigation menu